Full-chain UPW delivery for a 12-inch logic fab, covering source water analysis, process design (PFD/P&ID), in-house equipment manufacturing, on-site installation and 30-day FAT/SAT acceptance. Two years of continuous operation with resistivity stable above 18.2 MΩ·cm at point-of-use.

DESIGN CAPACITY

3m³/h

OUTPUT RESISTIVITY

10 μS/cm

TOC AT POU

< 1 ppb

Process

RO + Ozone

UPW Skid Hall
PROJECT SITE · UPW SKID HALL
Pre-treatment, 2-pass RO, EDI, mixed-bed polishing and UPW distribution loop, all in-house manufactured.
Project Fact Sheet

At a Glance

8 key data points

Industry Food Industry
Location Cambodia
Capacity 3 m³/h
Scope Full Turnkey
Process MMF + ACF + Single-Pass RO + Ozone Sterilization
Delivery 30 Days
Commissioned 2024-12
Status Normal Operation
Case Description

Pure water support for a food and beverage filling line

The case content below is organized from the supplied Word document and kept focused on the disclosed project data.

Food and beverage production usually requires pretreated clean water or purified water, with conductivity commonly controlled around 10 μS/cm. As pollution pressure increases and consumers pay more attention to health, food and beverage manufacturers face stricter water-quality requirements than ordinary municipal water or deep-well water can reliably satisfy.

For this Cambodia beverage-factory project, HONG JIE WATER delivered a 3 m³/h pure water system for a 300-barrel-per-hour filling production line. The system uses municipal tap water to prepare the pure water required for production, with equipment fabrication completed in 10 days and installation plus commissioning completed in 15 days before stable operation.

300barrels per hour line
10dequipment fabrication
15dinstall & commissioning
Process Flow

MMF + ACF + single-pass RO + ozone sterilization

The process route is taken directly from the case sheet and arranged as a clear engineering sequence for the detail page.

01

Municipal Water

Incoming tap water is used as the source water for production-water preparation.

02

MMF

Multimedia filtration helps reduce suspended solids, turbidity and visible particulate load.

03

ACF

Activated carbon filtration adsorbs residual chlorine, odor and part of the organic impurity load.

04

Single-Pass RO

Reverse osmosis removes dissolved salts, heavy metals, microorganisms and organic impurities.

05

Ozone Sterilization

Ozone helps strengthen microbial control for food and beverage water use.

06

Point of Use

Stable purified water is supplied to the barreled-water filling production line.

07

Auto Control

Liquid level control supports automatic replenishment and reduces manual attendance.

08

Stable Running

The system is recorded in the case sheet as operating normally after commissioning.

S 05 - Project Execution

On-site delivery, commissioning & acceptance

From equipment fabrication to installation and commissioning, the project was organized around fast delivery and stable acceptance for the beverage filling line.

From equipment production to stable operation: 10 days for fabrication, 15 days for installation and commissioning, with the full project delivery recorded as 30 days total. The gallery below presents the installation-site evidence structure listed in the Word document.

Water Quality Control

Control logic for food-industry purified water

Use the tabs to view the disclosed output indicators and the food-water context from the supplied document.

Core Target10 μS/cm

Conductivity is presented from the case hero metric and food-water description.

Conductivity and TOC indicators

The case sheet records output conductivity around 10 μS/cm and a TOC / feature value of ≤0.50 mg/L. These are presented as the main water-quality indicators for the project page.

3 m³/h design capacity 10 μS/cm conductivity metric ≤0.50 mg/L TOC / feature Stable production-water supply
Microbial Criteria≤100 CFU/mL

The document highlights bacterial-count control as an important food-water indicator.

Microorganism and control-bacteria targets

The supplied output field records aerobic bacterial count ≤100 CFU/mL, mold and yeast count ≤10 CFU/mL, and no detection of control bacteria such as Escherichia coli and Pseudomonas aeruginosa.

Aerobic count ≤100 CFU/mL Mold and yeast ≤10 CFU/mL No E. coli detected No P. aeruginosa detected
Industry RoleProduct Safety

Purified water is a core resource for food and beverage production quality.

Why food-industry purified water matters

The document states that food-industry purified water is production water that removes suspended matter, colloids, impurity ions and microorganisms through multi-stage purification, helping meet the specific standards required for food production.

Controls suspended solids Removes impurity ions Reduces microorganisms Supports food safety
Equipment Features

Flat technical highlights from the supplied case document

The feature cards below reorganize the equipment characteristics provided in the Word file.

Strong Recovery Effect

The system is described as having strong suction and recovery performance to help prevent pipe water accumulation and water hammer.

Multi-Stage Pumping

Imported high-temperature and high-pressure multistage pumps are noted, with a structure designed to resist cavitation.

Automatic Level Control

Liquid level can be automatically controlled, enabling automatic replenishment and reducing the need for manual attendance.

Three-Way Valve Control

Electric or pneumatic three-way control valves help the equipment start smoothly with lower hydraulic impact pressure.

Compact Integrated Skid

The whole machine is described as integrated, compact and carefully designed with imported high-grade core components.

Stable RO Membrane

The RO membrane configuration is described as supporting high desalination rate, stable operation and low energy consumption.

Ozone + Final Filtration

The system is equipped with an ozone generator and terminal membrane filter to help maximize point-of-use water quality.

Normal Operation

The project status supplied in the case sheet is normal operation, after equipment fabrication, installation and commissioning.

Customer Voice

Acceptance feedback and customer endorsement

The Word document does not disclose a customer name or original quotation, so this section is written as anonymized acceptance feedback based on the supplied project facts.

“
The system supported the filling line with stable pure water after commissioning, and the delivery rhythm matched the production start-up schedule.

Anonymous beverage-factory project feedback, summarized from the disclosed case facts: Cambodia location, 3 m³/h capacity, municipal-water purification, 15-day installation and commissioning, and normal operation status.

Beverage Factory Cambodia Normal Operation
Why It Builds Trust

Proof points visible to buyers

3 m³/h Matched production demand

Designed for the disclosed bottled/barreled water production requirement.

15d Fast site handover

Installation and commissioning were completed within the case timeline.

10 μS/cm Clear quality target

Conductivity target shown directly in the project indicators.

2024-12 Commissioned case

The project fact sheet records commissioning in December 2024.

Case Notes

Public-page handling for missing or optional source items

Click each note to expand. These notes are included to keep the published page faithful to the supplied case material.

No embedded image files were found in the Word package. The document lists image filenames and captions only, including project site, piping system and control cabinet notes. The page therefore uses a flat engineering visual rather than invented site photography.
The supplied document describes the customer as a beverage factory and gives Cambodia as the project location. It does not disclose a customer company name, so the page does not add one.
The case intro states that municipal tap water is used to prepare production pure water. The process is listed as MMF + ACF + single-pass RO + ozone sterilization.
◆ READY TO START YOUR PROJECT

Building a similar UPW system?

Share your source water report — our process engineers will respond within 24 hours with a tailored process recommendation and reference projects matching your industry and capacity requirements.

Get a Quote

Thank you for your trust; we will respond to your enquiry within 24 hours.

No spam, only technical feedback
Response within 24 hours
Used by semiconductor, pharma & battery industries

Get Your Water Report → PFD in 24 Hours

Our engineers will analyze your water report and provide a tailored PFD solution.

No spam, only technical feedback
Response within 24 hours Used by semiconductor, pharma & battery industries