Polysilicon Production

CASE-2024-10

JIANGSU, CN

Photovoltaic Industry Ultrapure Water System for Polysilicon Production

The source document did not include embedded usable project photos. This module keeps the case page visual, flat and consistent without fabricating customer-site images.

DESIGN CAPACITY

40m³/h

OUTPUT RESISTIVITY

18 MΩ·cm

TOC AT POU

<5 ppb

Process

MMF + ACF + Two-Stage RO + EDI + UV TOC Removal + PMB

UPW Skid Hall
Photovoltaic Polysilicon UPW
The source document did not include embedded usable project photos. This module keeps the case page visual, flat and consistent without fabricating customer-site images.
Project Fact Sheet

At a Glance

8 key data points

IndustryPhotovoltaic Industry
LocationJIANGSU, CN
Capacity40 m³/h
ScopeFull Turnkey
ProcessMMF + ACF + Two-Stage RO + EDI + UV TOC Removal + PMB
Delivery60 Days
Commissioned2024-12
StatusNormal Operation


Case Description

Ultrapure water support for photovoltaic polysilicon production

The case content below is organized from the supplied Word document and kept focused on the disclosed photovoltaic industry project data.

As global demand for renewable energy continues to grow, the photovoltaic industry plays an increasingly important role in sustainable development. In photovoltaic cell production, polysilicon is one of the most widely used materials, and ultrapure water is a critical element throughout polysilicon production.

This project was delivered as a full-process turnkey scope. HONG JIE WATER designed the system according to customer requirements, completed production, installation and commissioning, and handed over the equipment for stable operation.

40m³/h UPW capacity
60dtotal project delivery
2024-12commissioned operation
Process Flow

MMF + ACF + two-stage RO + EDI + UV TOC removal + PMB

The process route is taken directly from the case sheet and arranged as a clear photovoltaic ultrapure-water engineering sequence for the detail page.

01

Raw Water

Incoming water is stabilized before pretreatment and high-purity processing.

02

MMF

Multimedia filtration helps reduce suspended solids, turbidity and visible particulate load.

03

ACF

Activated carbon filtration adsorbs residual chlorine and part of the organic impurity load before RO.

04

Two-Stage RO

Two-stage reverse osmosis removes dissolved salts, ions and upstream impurity load before EDI and polishing.

05

EDI Polishing

EDI continuously removes residual ions without acid-base regeneration, supporting stable high-resistivity output.

06

Point of Use

Stable ultrapure water is supplied to polysilicon purification, wafer cleaning and chemical processing points of use.

07

Smart Control

Automated and intelligent control supports unattended operation and convenient daily management.

08

Stable Running

The system is recorded in the case sheet as operating normally after commissioning.

S 05 - Project Execution

On-site delivery, commissioning & acceptance

From process design to installation and commissioning, the project was organized around turnkey delivery and stable acceptance for photovoltaic polysilicon production.

From turnkey engineering to stable operation: the project delivery is recorded as 60 days total, with commissioning in 2024-12. The gallery below presents the installation-site evidence structure listed in the Word document.

Water Quality Control

Control logic for photovoltaic ultrapure water

Use the tabs to view the disclosed output indicators and the photovoltaic water-use context from the supplied document.

Core Target 18 MΩ·cm

Resistivity is presented from the case hero metric and project output requirements.

Resistivity and TOC indicators

The case sheet records output resistivity above 18 MΩ·cm and TOC below 5 ppb. These indicators support high-purity polysilicon production where ions, organics and particles can affect wafer quality and conversion efficiency.

40 m³/h design capacity
18 MΩ·cm resistivity metric
<5 ppb TOC / feature
Stable ultrapure water supply
UPW Purity Target High Purity

The document highlights high-purity water as a key photovoltaic polysilicon production requirement.

Ions, organics and particle control

The supplied description states that ultrapure water has extremely high purity and is almost free of ions, organics and particles, helping improve polysilicon purity, wafer surface quality and photovoltaic cell conversion efficiency.

Ion reduction
Organic control
Particle control
Wafer quality protection
Industry Role Product Safety

Ultrapure water is a core utility for photovoltaic polysilicon quality.

Why photovoltaic ultrapure water matters

The document states that ultrapure water is indispensable in polysilicon production, including purification, slicing, cleaning and chemical treatment, where water purity directly affects silicon surface quality and photoelectric conversion efficiency.

Supports polysilicon purification
Supports wafer cleaning
Improves conversion efficiency
Protects equipment & environment
Equipment Features

Technical highlights from the supplied photovoltaic project document

The feature cards below reorganize the equipment characteristics and technical advantages provided in the Word file for photovoltaic polysilicon production.

Continuous Water Output

The ultrapure water equipment is described as supporting continuous water output for high-standard photovoltaic production lines.

No Acid-Base Regeneration

EDI and polishing operation reduce the need for acid-base regeneration, helping lower operational burden and chemical handling.

Unattended Operation

High automation and intelligent design allow the system to adapt to polysilicon production-line standards with less manual attendance.

Simple Installation

The supplied document highlights simple installation and convenient operation as part of the equipment advantage.

Full Turnkey Delivery

The project was delivered as a full turnkey scope from design and production to installation, commissioning and handover.

Two-Stage RO + EDI + UV + PMB

Multi-stage treatment uses two-stage RO, EDI, UV TOC removal and PMB polishing to remove ions, organics and impurities for high-purity output.

High-Standard Adaptability

Highly automated and intelligent design helps the equipment meet stricter photovoltaic polysilicon manufacturing requirements.

Normal Operation

The project status supplied in the case sheet is normal operation, after equipment fabrication, installation and commissioning.

Customer Voice

Acceptance feedback and customer endorsement

The Word document does not disclose a customer name or original quotation, so this section is written as anonymized acceptance feedback based on the supplied project facts.

“
The system supported photovoltaic polysilicon production with stable ultrapure water after commissioning, and the turnkey delivery matched the project start-up schedule.

Anonymous photovoltaic project feedback, summarized from the disclosed case facts: Jiangsu, China location, 40 m³/h capacity, full turnkey delivery, 60-day delivery, 2024-12 commissioning and normal operation status.

Photovoltaic Industry Project Jiangsu, CN Normal Operation
Why It Builds Trust

Proof points visible to buyers

40 m³/h Matched UPW demand

Designed for the disclosed 40 m3/h photovoltaic ultrapure water requirement.

60d Turnkey delivery cycle

Design, production, installation and commissioning were delivered within the case timeline.

18 MΩ·cm Clear UPW target

Resistivity and TOC targets are shown directly in the project indicators.

2024-12 Commissioned case

The project fact sheet records commissioning in December 2024.

Case Notes

Public-page handling for missing or optional source items

Click each note to expand. These notes are included to keep the published page faithful to the supplied case material.

No embedded image files were found in the Word package. The document lists image filenames and captions only, including project site, piping system and control cabinet notes. The page therefore uses a flat engineering visual rather than invented site photography.
The supplied document describes the project as a photovoltaic industry case and gives JIANGSU, CN as the project location. It does not disclose a customer company name, so the page does not add one.
The case sheet lists the process as MMF + ACF + two-stage RO + EDI + UV TOC removal + PMB, with output targets including resistivity above 18 MΩ·cm and TOC below 5 ppb.
◆ READY TO START YOUR PROJECT

Building a similar UPW system?

Share your source water report — our process engineers will respond within 24 hours with a tailored process recommendation and reference projects matching your industry and capacity requirements.

Get a Quote

Thank you for your trust; we will respond to your enquiry within 24 hours.

No spam, only technical feedback
Response within 24 hours
Used by semiconductor, pharma & battery industries

Get Your Water Report → PFD in 24 Hours

Our engineers will analyze your water report and provide a tailored PFD solution.

No spam, only technical feedback
Response within 24 hours Used by semiconductor, pharma & battery industries